D2.2: Performance and return on investment of urban water systems
Creators
- Steffelbauer, David1
-
Rustler, Michael1
-
Riechel, Mathias1
-
Schwarzmüller, Hella1
-
Mancini, Adriano2
-
Fatone, Francesco2
-
Battista, Gian3
-
Gandolfi, Claudio3
-
Bernardi, Marco4
-
Sperlich, Alexander5
- Gunkel, Michel5
- Gensch, Stefan6
- Schilperoort, Remy7
- Baibich, Ricardo Gilead8
- Greenhill, Barbara9
- Thornberg, Dines9
- Thirsing, Carsten9
- Lindberg, Sten10
- Fröhlich, Laura10
-
Gutierrez, Oriol11
-
Busquets, Silvia11
- Amela, Neus12
- Martinez, José Luis12
- Margreiter, George13
- 1. Kompetenzzentrum Wasser Berlin gGmbH
- 2. UNIVPM
- 3. UNIMI
- 4. CAP
- 5. Berliner Wasserbetriebe
- 6. VRAGMENTS
- 7. P4UW
- 8. KANDO
- 9. BIOFOS
- 10. DHI
- 11. ICRA
- 12. IOTSENS
- 13. IPEK
Description
This report contains the demonstration outcomes of 11 digital solutions under WP2. For each solution, it describes the demonstration site and challenges, the achievements in terms of performance and return on investment and the approach to assess and quantify the benefits via solution-specific key performance indicators (KPIs). Section 1 introduces the solutions and their targeted impacts. The following section 2 to 12 document the demonstration of the digital solutions (DSs). For each DS, the solution itself and demonstration are outlined, KPI definition is documented and return on experience is assessed. At this stage, all DS are finalised, the KPI are defined, and fully assessed. This deliverable is further part of the full “environment” of WP2 deliverables. The baseline for implementing and demonstrating the DS is detailed in D2.1 Implementation plan (M12), and technical specifications and expected benefits and recommendations for replication are given in D2.4 Technology report.
This document is an update of the last performance report delivered in M42. Updates include:
An overview table in the executive summary highlighting the key elements on performance and learnings from the experience for each digital solution, as well as some minor correction of typos and symbols as suggested by the reviewers.
Files
DWC_D2-2_2023-01_Performance_Report_V.pdf
Files
(6.7 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:ae82b510247596927a5e635985546db4
|
6.7 MB | Preview Download |
Additional details
Funding
Dates
- Submitted
-
2023-01-31