Published October 12, 2018
| Version v1
Project deliverable
Open
Integration Plan and Description of the Integration Infrastructure
Description
This deliverable describes the roadmap and procedures for integrating the software components developed and adapted in WP3 of HORSE project into a functional system. The document introduces an incremental approach of building and validating the integrated platform following the increasing maturity of the software modules. The source code developed in the project is stored and versioned in a GIT repository. Internal builds will be produced on a regular basis with the help of automated tools and scripts and will undergo automated or human assisted testing.
Files
HORSE_D4.1-v2.00.pdf
Files
(1.7 MB)
Name | Size | Download all |
---|---|---|
md5:586bfb8a9987399421fb3ed514c6f18e
|
1.7 MB | Preview Download |