Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published January 31, 2021 | Version v1
Project deliverable Open

D1.2 Periodic Status Report #1

  • 1. University of Strathclyde

Description

This report report details the Year 1 progress of each work package from the X-ROTOR project.

Files

XROTOR D1.2.pdf

Files (3.9 MB)

Name Size Download all
md5:72cffb1dccc6f31bd3d142ae17346cd6
3.9 MB Preview Download

Additional details

Funding

XROTOR – X-ROTOR: X-shaped Radical Offshore wind Turbine for Overall cost of energy Reduction 101007135
European Commission