Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published September 20, 2022 | Version v1
Project deliverable Open

D2.6 Results of multibody analysis (of X-ROTOR concept)

  • 1. CENER

Description

This deliverable report details the results of the study performed on the X-Rotor primary rotor.

Files

XROTOR D2.6.pdf

Files (2.2 MB)

Name Size Download all
md5:ef36abb43ba6c02ab487e05511c043d9
2.2 MB Preview Download

Additional details

Funding

XROTOR – X-ROTOR: X-shaped Radical Offshore wind Turbine for Overall cost of energy Reduction 101007135
European Commission