Project milestone Open Access

Construction and operation of a High Temperature ALD system dedicated to SRF Cavities

I.FAST WP9 members

Particle accelerator construction and operation cost reduction is a crucial topic for future accelerators. This task aims at studying and developing new superconductors and structures to increase the performances of superconducting radio frequency cavities. To that end, we have built a custom deposition system that can handle various cavity sizes and shapes.

Files (1.0 MB)
Name Size
IFAST_MS40_Final.pdf
md5:7f80648063414d19ca7b320597b9caae
1.0 MB Download
  • I.FAST MS40

24
21
views
downloads
All versions This version
Views 2424
Downloads 2121
Data volume 21.9 MB21.9 MB
Unique views 2323
Unique downloads 2020

Share

Cite as