Published October 7, 2022 | Version v1
Project milestone Open

Construction and operation of a High Temperature ALD system dedicated to SRF Cavities

Description

Particle accelerator construction and operation cost reduction is a crucial topic for future accelerators. This task aims at studying and developing new superconductors and structures to increase the performances of superconducting radio frequency cavities. To that end, we have built a custom deposition system that can handle various cavity sizes and shapes.

Files

IFAST_MS40_Final.pdf

Files (1.0 MB)

Name Size Download all
md5:7f80648063414d19ca7b320597b9caae
1.0 MB Preview Download

Additional details

Funding

I.FAST – Innovation Fostering in Accelerator Science and Technology 101004730
European Commission

References

  • I.FAST MS40