Published October 7, 2022
| Version v1
Project milestone
Open
Construction and operation of a High Temperature ALD system dedicated to SRF Cavities
Creators
Description
Particle accelerator construction and operation cost reduction is a crucial topic for future accelerators. This task aims at studying and developing new superconductors and structures to increase the performances of superconducting radio frequency cavities. To that end, we have built a custom deposition system that can handle various cavity sizes and shapes.
Files
IFAST_MS40_Final.pdf
Files
(1.0 MB)
Name | Size | Download all |
---|---|---|
md5:7f80648063414d19ca7b320597b9caae
|
1.0 MB | Preview Download |
Additional details
Funding
References
- I.FAST MS40