Published September 6, 2022 | Version 0.1
Dataset Open

Joint Optimization of Production and Maintenance for Cost-effective Manufacturing and Demand Response Participation Dataset - Total Cost and Machine Occupancy Deviation Optimization

Creators

  • 1. GECAD, Polythecnic of Porto

Contributors

  • 1. GECAD, Polythecnic of Porto

Description

Using the previous dataset at <https://zenodo.org/record/4106746> a total cost and machine occupancy deviation optimization scenario was formulated that aims to demonstrate how the proposed scheduler is able to balance tasks between machines while also reducing overall costs. For this scenario, it was considered an optimization weight of 0.5 for both the total costs and machine occupancy deviation objectives and the genetic algorithm was executed for 2 hours.

 

File Description:

  • Input_JSON_Total_Cost_Machine_Occupancy_Deviation_Optimization - JSON input data for the total cost and machine occupancy deviation optimization
  • Output_JSON_Total_Cost_Machine_Occupancy_Deviation_Optimization - JSON output data for the total cost and machine occupancy deviation optimization
  • Output_Statistics_Total_Cost_Machine_Occupancy_Deviation_Optimization - Excel output total cost and machine occupancy deviation optimization statistics