Production line dataset for task scheduling and energy optimization - Schedule Optimization
- 1. GECAD, Polythecnic of Porto
Description
The case study of this dataset uses real production data, provided by a textile company that manufactures hang tags. Their working schedule is from 7h00 of Monday to 23h00 of Saturday. This dataset uses a period of 5 minutes for all task durations and energy data. The case study considers a six-day period from 7h00 of Monday to 23h00 of Saturday. The scheduling algorithm was used for three machines that share the same cell.
The API can be found at <http://www.gecad.isep.ipp.pt/api/spear/>
File Description:
- Input_JSON_Schedule_Optimization - JSON input data for the schedule optimization
- Output_JSON_Schedule_Optimization - JSON output data for the schedule optimization
- Output_Statistics_Schedule_Optimization - Excel output schedule optimization statistics