Project milestone
Open
First NEG coated samples are installed on SR beamline at DLS and Soleil
Creators
Description
Report is related to achieving I.FAST Milestone 48 (First NEG coated samples are installed on SR beamline at DLS and Soleil). A new dedicated SR beamlines was built and tested at DLS, a sample coated with NEG at UKRI/STFC has been installed and ready for a test immediately after restarting DLS operation (after scheduled shutdown) from mid-April. An existing dedicated SR beamlines at Soleil Synchrotron was recommissioned and tested with 3 samples coated with NEG at SAES Getters. Thus, the I.FAST Milestone 48 (First NEG coated samples are installed on SR beamline at DLS and Soleil) has been met.