Published March 30, 2022 | Version v1
Project milestone Open

First NEG coated samples are installed on SR beamline at DLS and Soleil

Authors/Creators

Description

Report is related to achieving I.FAST Milestone 48 (First NEG coated samples are installed on SR beamline at DLS and Soleil). A new dedicated SR beamlines was built and tested at DLS, a sample coated with NEG at UKRI/STFC has been installed and ready for a test immediately after restarting DLS operation (after scheduled shutdown) from mid-April. An existing dedicated SR beamlines at Soleil Synchrotron was recommissioned and tested with 3 samples coated with NEG at SAES Getters. Thus, the I.FAST Milestone 48 (First NEG coated samples are installed on SR beamline at DLS and Soleil) has been met.