Published December 17, 2018
| Version 1.5
Project deliverable
Open
D4.1 - First example of content
Description
The deliverable describes the production and post-production process for Pilot 1, with information on the material created and a roadmap for the subsequent pilots.
This document shows the creation process of the First Pilot: pre-production (concepts, storyboards, script, casting), The motion capture process and the shooting in Geneva, and the post-production process (editing, conforming, 3D scenario, 3D elements, compositing works, integration, color grading, etc).
Files
D4.1 - First example of content.pdf
Files
(3.1 MB)
Name | Size | Download all |
---|---|---|
md5:d3a17784d186363d131f02c8029c8c96
|
3.1 MB | Preview Download |