Published September 16, 2019
| Version v1
Project deliverable
Open
D5.2-Pilot evaluation methodology and plan
Description
This document defines for each iteration the evaluation methodology to be followed, based on the requirements. It establishes what elements are evaluated and the calendar of evaluation activities.
Files
D5.2.pdf
Files
(1.3 MB)
Name | Size | Download all |
---|---|---|
md5:327a04b878abbb9b2313a0aa373189f7
|
1.3 MB | Preview Download |