Published May 31, 2022 | Version First
Other Open

D5.4 The SENTINEL Minimum Viable Product

  • 1. INTRASOFT
  • 2. AEGIS
  • 3. Airbus (ACS)
  • 4. FOCAL POINT
  • 5. IDIR
  • 6. ITML
  • 7. TSI
  • 8. SPHYNX Technology Solutions (STS
  • 9. LIST

Description

This deliverable showcases the SENTINEL Minimum Viable Product (MVP) and illustrates the activities that were carried out to that end. Following the Lean start-up methodology [1], SENTINEL has aimed to the early release of a functional, integrated, end-to-end demonstrator that serves as a proof-of-concept for the overarching goals of the project and displays the potentials of the sought solution. The deliverable has been developed within the scope of ‘WP5 – SENTINEL continuous integration and system validation’.

Files

D5.4_The_SENTINEL_MVP.pdf

Files (2.6 MB)

Name Size Download all
md5:45082b528a3a5a598fba8f40446a205a
2.6 MB Preview Download