Published February 15, 2023 | Version v1
Journal article Open

Sustainable recovery of critical elements from seawater saltworks bitterns by integration of high selective sorbents and reactive precipitation and crystallisation: Developing the probe of concept with on-site produced chemicals and energy

  • 1. Chemical Engineering Department, Escola d'Enginyeria de Barcelona Est (EEBE), Universitat Politècnica de Catalunya (UPC)-BarcelonaTECH, C/ Eduard Maristany 16, Campus Diagonal-Besòs, 08019 Barcelona, Spain Barcelona Research Center for Multiscale Science and Engineering, C/ Eduard Maristany 16, Campus Diagonal-Besòs, 08019 Barcelona, Spain
  • 2. Dipartimento di Ingegneria, Università degli Studi di Palermo, Viale delle Scienze ed. 6, 90128 Palermo, Italy
  • 3. Fraunhofer Institute for Solar Energy Systems ISE, Heidenhofstraße 2, Freiburg im Breisgau 79110, Germany
  • 4. Chemical Engineering Department, Escola d'Enginyeria de Barcelona Est (EEBE), Universitat Politècnica de Catalunya (UPC)-BarcelonaTECH, C/ Eduard Maristany 16, Campus Diagonal-Besòs, 08019 Barcelona, Spain Barcelona Research Center for Multiscale Science and Engineering, C/ Eduard Maristany 16, Campus Diagonal-Besòs, 08019 Barcelona, Spain CETaqua, Carretera d'Esplugues, 75, 08940 Cornellà de Llobregat, Spain

Description

The availability of raw mineral resources containing elements included in the Critical Raw Materials (CRMs) list is a growing concern for the European Union. Sea mining has been identified as a promising secondary source. In particular, brines obtained in solar saltworks (bitterns) contain relevant amounts of valuable CRMs such as Mg(II), B(III), other alkaline/alkaline earth metals (Rb(I), Cs(I), Sr(II)) and transition/post-transition elements (Co(II), Ga(III), Ge(IV)). However, the low concentration of some of these elements (µg/L) requires an effort to develop recovery routes that are sustainable and economically feasible where the required chemicals and energy are produced on-site from the saltworks bitterns (i.e. HCl and NaOH). Even the conventional recovery processes such as ion exchange, sorption and precipitation, which have proved to be competitive for metals recovery, are challenged in the case of Trace Elements (TEs). This work studies the recovery of TEs included in the CRMs list from saltworks bitterns after ion exchange processes. First, batch crystallisation and reactive precipitation were tested for some target elements in single-component solutions: Sr(II), Co(II), Ga(III), Ge(IV) and B(III). Then, the experiments were carried out with multi-component synthetic solutions assuming different scenarios of bittern streams coming out a selective extraction stage using sorption and ion exchange processes. The targeted elements were recovered except for Ge(IV), where alternative routes need to be evaluated, as its precipitation involves the use of tannic acid or sulphide solutions that could not be produced from the bitterns. However, a further concentration step would be necessary to achieve element concentrations closer to the mineral phases saturation. Moreover, model simulations were performed using the PHREEQC program, which provided a good prediction of the experimental trends obtained in most cases.

Notes

This work was supported by the EU within SEArcularMINE (Circular Processing of Seawater Brines from Saltworks for Recovery of Valuable Raw Materials) project – Horizon 2020 programme, Grant Agreement No. 869467. This output reflects only the author's view. The European Health and Digital Executive Agency (HaDEA) and the European Commission cannot be held responsible for any use that may be made of the information contained therein. This study has been also supported by the Research Spanish Agency (AEI) through the Resources recycling from agri‐food urban and industrial wastes by integration of hybrid separation processes (W4V) project (PID2020-114401RB-C21) and the Catalan Agaur Agency through the 2017SGR312. Additionally, the authors acknowledge the OpenInnovation – Research Translation and Applied Knowledge Exchange in Practice through University-Industry-Cooperation (OpenInnoTrain), Grant Agreement Number (GAN): 823971, H2020-MSCA-RISE-2018-823971.

Files

Valles_Sustainable recovery of critical elements from seawater saltworks bitterns by integration of high selective sorbents and reactive precipitation and crystall.pdf

Additional details

Related works

Funding

SEArcularMINE – Circular Processing of Seawater Brines from Saltworks for Recovery of Valuable Raw Materials 869467
European Commission