Published July 13, 2023 | Version v1
Journal article Open

Revise case andre

  • 1. CNE

Description

Kibamba Hydro Power Project is one of the 8 cascade located on the luvua river with a projected installed capacity of 282 MW and with the others waterfall could reduce the deficit in Katanga province and then promote the reduction of the energy deficit and contribute to the development of the mining sector, the main driving force of the Congolese economy;

Files

Revised Case Andre (1).zip

Files (80.0 kB)

Name Size Download all
md5:f45a15376775442d80b35a41356ae5e9
80.0 kB Preview Download