Published May 31, 2023
| Version v1
Journal article
Open
Mohamud Abdulahi Roble
Description
The intent of this study was to describe any effect that the project manager‘s responsibility on the Project‘s Success and ultimate delivery of the project. This study is considered a descriptive cause/effect study. The data were collected from 160 project managers from 33 companies that use project-based structure by questionnaire, which was built and developed for this purpose. Collected questionnaires were checked and coded against SPSS 20. After checking normality, validity, and reliability, multiple regressions were used to test the hypothesis.
Files
Files
(266.8 kB)
Name | Size | Download all |
---|---|---|
md5:0da0031db6bff816943c2cbf4002e287
|
266.8 kB | Download |