Published May 19, 2023 | Version v1
Dataset Open

TRINITY DC 02.03.01 New RES plant location analysis

  • 1. ETRA I+D

Description

This demo aims at testing the capacity of the Dynamic Map cluster of modules of the T-RES CONTROL CENTRE to speed-up and optimize the decision making process for selecting an optimal location for a new RES installation.

This dataset contains replicable cases for the use of the product created in TRINITY, Dynamic Map. The inputs used are the following:

  • Active power
  • Reactive power
  • Technology case
  • Asset model
  • Location
  • Substation

Files

Files (17.3 MB)

Name Size Download all
md5:79b901f10c151b247183e25ee13fea47
17.3 MB Download

Additional details

Funding

European Commission
TRINITY - TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY 863874