Published February 16, 2021 | Version v1
Conference paper Open

Comparison of integrated fuel processing options for biogas-fed solid-oxide fuel cell plants

  • 1. National Engineering Laboratory of Biomass Power Generation Equipment, North China Electric Power University, Beijing 102206, China
  • 2. Group of Energy Materials, Swiss Federal Institute of Technology in Lausanne, Sion 1951, Switzerland
  • 3. School of Engineering, Department of Economics, Engineering, Society and Business Administration, University of Tuscia, 01100 Viterbo Italy
  • 4. Industrial Process and Energy Systems Engineering, Swiss Federal Institute of Technology in Lausanne, Sion 1951, Switzerland

Description

The Solid-oxide fuel cell is a highly efficient prime mover for biogas conversion, but a part of biogas needs to be reformulated externally to facilitate the electrochemical conversion, easy control of reforming conditions, and thermal management of the stack. Carbon deposition and external mineralcarrying water should be avoided to ensure the durability of the fuel processor and stack catalysts. This paper investigates four plant layouts with different anode off-gas recirculation schemes and biogas reforming methods: (1) pre-reforming with hot recirculation (HR), (2) pre-reforming with cold recirculation (CR), (3) no pre-reforming and hot recirculation (NR), (4) partial oxidation with hot recirculation (PO). All the schemes feature an electrolyte supported SOFC working at 860°C and 0.23 A/cm2 current density. A sensitivity analysis of the plant efficiency as a function of the Recirculation Ratio (RR) and the Reformer Temperature (RT) is performed. The results show that HR and CR schemes achieve the highest efficiency (58-63%). The HR scheme benefits from the recirculated water and does not require external water for RR > 50% and RT > 600°C; the CR scheme achieves the same result for RR > 80% and RT > 700°C. The optimal RR is within 50 – 80% for the highest system efficiency, as a trade-off between the overall fuel utilization and electrochemistry performance. The RT should be between 600 and 700°C. The HR scheme is the overall best performing if the re-circulator and stack designs do not limit the flow rates at a high RR.

Notes

This work has received funding from the European Union's Horizon 2020 under grant agreement No 826234 (Waste2Watts), 826161 (Waste2GridS), 815284 (BLAZE) and 735692 (CH2P), and, and support from the Fuel Cells and Hydrogen Joint Undertaking, Hydrogen Europe and Hydrogen Europe Research.

Files

e3sconf_100res2021_04002.pdf

Files (1.0 MB)

Name Size Download all
md5:2039761d85d125151066da273b74bc82
1.0 MB Preview Download

Additional details

Funding

European Commission
BLAZE - Biomass Low cost Advanced Zero Emission small-to-medium scale integrated gasifier-fuel cell combined heat and power plant 815284
European Commission
WASTE2WATTS - Unlocking unused bio-WASTE resources with loW cost cleAning and Thermal inTegration with Solid oxide fuel cells 826234
European Commission
WASTE2GRIDS - Converting WASTE to offer flexible GRID balancing Services with highly-integrated, efficient solid-oxide plants 826161
European Commission
CH2P - Cogeneration of Hydrogen and Power using solid oxide based system fed by methane rich gas 735692