Published July 12, 2022
| Version 1.0
Report
Open
D3.4 Infrastructural code generation_v1_V1.0
Description
These deliverables will present the outcome of Task T3.4. Each deliverable will comprise both a software prototype [KR3] and a Technical Specification Report. The document will include the ICG technical design and will report related research results.
Files
D3.4 Infrastructural code generation_v1_V1.0_20211130 (1)_marca.pdf
Files
(1.9 MB)
Name | Size | Download all |
---|---|---|
md5:59cff603da03da15aa56d30d9b37ca0a
|
1.9 MB | Preview Download |