Published June 3, 2005
| Version v1
Journal article
Restricted
Insulation co-ordination for continuous operating voltages and temporary overvoltages
- 1. Electrical Engineering Institute "Nikola Tesla", University of Belgrade, Belgrade, Serbia
Description
This paper presents an approach to the insulation co-ordination of electric-power installations in the scope of the continuous operating voltages and temporary overvoltages; this approach opens the possibility to calculate the necessary required withstand voltages of unit insulations for short-duration (1 min) power-frequency test voltage, with respect to continuous operating voltages and power-frequency temporary overvoltages and the necessary reliability of the operation of high-voltage power system installations.