Published March 3, 2021 | Version v1
Project deliverable Open

D3.2:Management and Orchestration (Release B)

Creators

Description

The aim of this document is to provide a final description of the design and implementation of the Management and Orchestration (MANO) building block of the 5GENESIS facility. This document starts with a summary of the Release A of the MANO framework [1], i.e. the midterm version delivered on 5GENESIS project month 15 (M15) reported in Deliverable 3.1. The work has been evolving a lot from that implementation, several new features have been adopted during the project development, facilitated by discussions held in the regular work packages teleconferences and in project general assembly meetings. During the second Release of the MANO building block, an updated architecture is described, including the components it is made of, that depicts all the internal interfaces and communication channels with the rest of the components of the 5GENESIS facility. Additionally, this document provides an exhaustive description of how this architecture has been implemented to fulfil the requirements of the deployments of the different 5GENESIS facilities, as well as all the specifications and workflow designed for the developed functionalities of the component. Finally, the contribution to the open source community is described, with the implementation of the NS repository under the latest release of Open Source MANO (OSM) under version 8, from the 5GENESIS project. This deliverable serves as the final version of the deliverable D3.1 Management and orchestration (Release A) [1] at M15, reporting the final implementation for the MANO enablers.

Files

5GENESIS_D3.2-v1.0.pdf

Files (2.4 MB)

Name Size Download all
md5:c12f0ef7355b39cc54324b9c2ce9891e
2.4 MB Preview Download

Additional details

Funding

European Commission
5GENESIS – 5th Generation End-to-end Network, Experimentation, System Integration, and Showcasing 815178