Published April 6, 2017 | Version v1
Project deliverable Open

Risk register system and procedures (D7.2)

  • 1. DMI

Description

About this document
Deliverable: D7.2
Work package in charge: WP7 Management
Actual delivery date for this deliverable: Project‐month 3
Dissemination level: The general public (PU)

Summary

This deliverable aims at ensuring a smooth coordination of the project for a high quality of results and implementation. This deliverable describes the participatory process conducted within the consortium to identify the risks that might occur during the project implementation. Such risks are related to three main activities: i) research and innovation, ii) management, and iii) dissemination and exploitation of results. The coordination and the project office have set up a risk management system with procedures for tracking foreseen and unforeseen risks, and implementing adequate corrective and mitigation measures. A risk register is thoroughly applied throughout the project life cycle to keep track of materialized and potential risks and applied corrective and preventive measures.

Notes

We support the Blue Growth! Visit us on: www.blue‐action.eu Follow us on Twitter: @BG10Blueaction

Files

D7.2-FINAL.pdf

Files (258.3 kB)

Name Size Download all
md5:efc0293d4e1d3557eda518e520fd8c6c
258.3 kB Preview Download