Published January 15, 2021 | Version 3.0
Report Open

Analysis, recommendations and roadmap at the European level

  • 1. CEA
  • 2. DLR

Description

The objective of this deliverable is to draw recommendations and propose an implementation plan for the deployment of water electrolysers  providing grid services.
The first section gives an overview of the work conducted in the scope of QualyGridS project and describes the key targeted audience for the dissemination of the project.
The next two sections detail the main results on technical and economic aspects obtained through the project and the associated recommendations.
The fourth section describes all the actions related to the standardization effort for the test protocol and its dissemination.
As a conclusion, the last section summarizes the main recommendations and suggests an implementation plan.
 

Files

D6_5_uploaded_downloaded_for_Zenodo.pdf

Files (1.1 MB)

Name Size Download all
md5:d07d76767c05adfe4cd01f4b3da66dca
1.1 MB Preview Download

Additional details

Funding

QualyGridS – Standardized Qualifying tests of electrolysers for grid services 735485
European Commission