Factors Identification and Conformance of Quality of Cement and Coarse Aggregate used at Gautama Buddha Airport Upgrading Component, Nepal
- 1. Associate Professor, Madan Bhandari Memorial Academy Nepal, Urlabari 3, Morang, Nepal, Email: anjaymishra2000@gmail.com
- 2. Engineer, Tulsipur Sub-Metropolitan, Dang, Nepal, Email: guptadines47@gmail.com
- 3. Professor, College of Management & Commerce, Srinivas University, Mangalore, India
Description
Quality management system has been challenging in construction of airport project. The objective of
study is to assess the factors affecting quality and conformance of Cement and Coarse Aggregate
standard used at Construction Site of Gautam Buddha Airport Upgrading Component. This research
is based on key informant interview with supervisor and site engineers, questionnaires survey with
clients, consultants and contractors who were involved in airport construction projects along with lab
test of cement and coarse aggregate of airport construction sites. Statistical tools mean value and
relative importance index were used for the ranking of different quality methods. Airport follows
specification and standard technical guidelines for the airport construction work. The major factors
affecting the quality management in airport construction was Unavailability of competent staff, Low
quality drawing and specification and Poor-quality procedure and department for ensuring quality
assurance practice Provide training and seminar on quality assurance and Support the setting up of of
cube of 3 days, 7 days and 28days is18.8N/mm2(>16N/mm2), 27.20N/mm2(>22N/mm2) and
39.40N/mm2(>33N/mm2) respectively. The average initial setting Time and final setting time of
cement is 180 min(>45min) and 351 min(<600min) respectively and average soundness of cement is
2.7mm(<10mm). The test for aggregate, it was found that average Los Angeles Abrasion value of
aggregate was 32.8%(<40%), average crushing value of aggregate was 19.88%(<25%), Flakiness
index of aggregate found that 19.85%(<25%) and the gradation of aggregate was found that within
specification. Quality in airport construction starts from selection of material, inspection, tests
employed.