Published June 18, 2006
| Version v1
Conference paper
Open
A Simulation-Optimization Model for Cascade Multi-Reservoir Hydropower Systems Operations
Description
Sequential streamflow routing (SSR) with control on reliability of meeting energy
demand is a common method for assessing energy potential in practical hydropower
projects' design and operation in Iran. This approach results in developing a
reliability-based simulation (RBS) model which is used for design of single-
reservoir hydropower projects. On the other hand, in most cascade hydropower systems
in the country, a single-reservoir RBS model is usually used for design and
operation of each reservoir, independently. Considering the fact that the integrated
analysis of the system may lead to design variables and system energy potential
which could be different from those obtained by subsequent single-reservoir
analysis, a multi-reservoir simulation-optimization model is proposed considering
the integrated system operations. The core of the model developed is the same as
what is used in a single-reservoir RBS model as a simple and well-known model in
professional applied hydropower practices. However in multi-reservoir RBS model, the
energy equation in each time period becomes indeterministic with more than one
unknown variable, i.e. turbine releases. Therefore, an iterative single-period
linear programming (LP) model is used in each time step of the simulation model. The
LP model minimizes the sum of reservoir releases and/or maximizes the sum of
reservoir storages subject to continuity equations, minimum energy demand
requirement and bounds on state and decision variables as model constraints. Another
multi-reservoir model was also tested in which a heuristic operating policy is used.
The application of the above-mentioned models is analyzed in the Khersan hydropower
reservoir system located in Iran as the case study. For reliability of meeting
energy demand equal to 90%, results indicate that the multi-reservoir RBS model
proposed increases the system firm energy by 7.9% compared to the model which
sequentially uses single-reservoir RBS models.
Notes
Files
A_Simulation-Optimization_Model_for_Cascade_Multi-Reservoir_Hydropower_Systems_Operations.txt
Files
(2.0 kB)
Name | Size | Download all |
---|---|---|
md5:21a920ff7cf48d911d85bc384b46e8fe
|
2.0 kB | Preview Download |