Published June 18, 2018
| Version v1
Poster
Open
On the Design of 5G End-to-End Facility for Performance Evaluation and Use Case Trailing
Creators
- 1. Telenor
- 2. Eurescom GmbH
- 3. Samsung
- 4. University of Patras
- 5. Keysight
- 6. Fraunhofer Fokus
- 7. BT
Description
A focus area of phase 3 of 5G PPP is the design and deployment of a 5G end-to-end facility that can demonstrate that the key 5G network KPIs can be met, and which can be accessed and used by vertical industries. This poster paper presents key guidelines to implement such a 5G end-to-end facility.
Files
Poster 5G-Vinni - EUCNC 2018.pdf
Files
(604.3 kB)
Name | Size | Download all |
---|---|---|
md5:bebbb262fa82d3c5566b17a834b3a802
|
604.3 kB | Preview Download |