Published December 10, 2018 | Version v1

FCC-ee Operation Model, availability and Performance

  • 1. CERN
  • 2. ADAM SA, Meyrin, Switzerland
  • 3. IHEP Beijing, China
  • 4. INFN Frascati, Italy

Description

This document discusses the machine parameters and
expected luminosity performance for the proposed future
circular lepton collider FCC-ee. Particular emphasis is put
on availability, physics run time, and efficiency. Key per-
formance assumptions are compared with the operational
experience of several past and present colliders including
their injectors — LHC, LEP/LEP-2, PEP-II, KEKB, BEPCII,
DAFNE, SLC and the SPS complex.

Files

ARIES-Note-2018-004.pdf

Files (3.8 MB)

Name Size
md5:48bda4658d2477ce05d77a50f7c6153e
3.8 MB Preview Download

Additional details

Funding

European Commission
ARIES - Accelerator Research and Innovation for European Science and Society 730871