Deliverable D2.3 – Delivery of suitable concentrates to WP3

Description

The document presents a summary of the mineral concentrates obtained within the work carried out in WP2 (Selection of mine waste sites; physical minerals separation and concentration) and the samples delivered to the WP3 (Materials modelling and processing) partners of the START consortium, to be used in the implementation of the activities of Task 3.2 - Mechanochemical synthesis of mineral-derived sulphide p-type materials and of Task 3.4 - Production of mineral-derived sulphide p-type materials by rapid casting production process. The summary of the concentrates delivered can be seen in the annex of this document.