Published May 19, 2025
| Version v1
Project deliverable
Open
Deliverable D2.2 – Treatment and separation of suitable minerals: Physical separation of key minerals and concentration
Authors/Creators
- de Oliveira, Daniel (Project member)1
- Morais, Igor (Project member)1
- Albardeiro, Luís (Project member)1
- Prazeres, Cátia (Project member)1
- Soltes, Stanislav (Project member)2
- Pfleiderer, Sebastian (Project member)3
- Lipiarski, Piotr (Project member)3
- Auer, Christian (Project member)4
- Unterweissacher, Thomas (Project member)5
- Strauß, Roland (Project member)5
- Meima, Jeannette (Project member)6
- José, António (Project member)6
- Wittenberg, Antje (Project member)6
- Lopes, Luís (Project member)7
- Boixereu, Ester (Project member)8
- Fernández-Leyva, Concepción (Project member)8
- Guzman, Fredy (Project member)9
Description
Deliverable 2.2 of the START project presents a summary of the work being undertaken in WP2 (Selection of mine waste sites; physical minerals separation and concentration) to concentrate the samples of tetrahedrite, aiming to deliver as-pure-as-possible concentrates of this mineral to the other technical WP’s in the project to test them and use them in the production of the p-type semiconductor thermoelement.
Files
START - D2.2 - v3.0.pdf
Files
(3.5 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:ee2c460ef045902e425008294beadbe0
|
3.5 MB | Preview Download |
Additional details
Funding
Dates
- Submitted
-
2023-12-13