Published March 3, 2026 | Version v1
Project deliverable Open

D2.2 Definition of the requirements, use cases and system specifications final version

Description

PLOTO project aims at increasing the resilience of the Inland WaterWays (IWW) infrastructures and the connected hinterland-infrastructures, thus ensuring reliable network availability under unfavourable conditions, such as extreme weather, accidents and other kind of hazards. PLOTO’s main target is to combine downscaled Climate Change (CC) scenarios (applied to IWW infrastructures) with simulation tools and actual data, so as to provide the relevant authorities and their operators with an integrated tool able to support more effective management of their infrastructures at strategic and operational levels. The PLOTO integrated platform and its tools will be validated in three case studies in Belgium, Romania, and Hungary. The aim of this report is to:


•refine the end-user requirements (Section 3), as presented in D2.1 (T2.2);
•produce a detailed specification of PLOTO system requirements (Section 4, T2.2);
•describe the PLOTO platform’s modules as part of the high-level architectural specification (Section 5, T2.3) and;
•define the scenarios (Section 6) together with the relevant set of Key Performance Indicators (KPIs, Section 7) (T2.2).

Files

D2.2 Definition of the requirements, use cases and system specifications final version.pdf

Additional details

Funding

European Commission
PLOTO - Deployment and Assessment of Predictive modelling, environmentally sustainable and emerging digital technologies and tools for improving the resilience of IWW against Climate change and other extremes 101069941