Published December 15, 2025
| Version v1
Project deliverable
Open
Construction of the XLS Accelerating Structure Pre-Prototype
Authors/Creators
Description
This following document (D7.5) confirms the successful construction of the CompactLight accelerating structure prototype within the I.FAST WP7. This achievement marks a key step towards Deliverable D7.6 and the realization of the full accelerating structure.
Files
IFAST_Del7.5_Final.pdf
Files
(7.8 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:d3f493fcf9029778754c1dd71e7c858b
|
7.8 MB | Preview Download |