D5.1 Pilot definition, set-up & validation plan
Authors/Creators
Description
This deliverable D5.1 defines the EMERALD pilots as well as their set-up. Additionally, it introduces the validation plan of the EMERALD framework and its pilots. Through the definition of the pilots, specifically their respective business-driven requirements and the Key Performance Indicators (KPIs), the deliverable aims to support the technical work packages (WP1-WP4) of EMERALD in gaining a deeper understanding of the pilot goals and requirements. This is intended to ease the communication within the EMERALD project, specifically between the technical and non-technical work packages. It is intended that the validation plan will serve to generate iterative feedback to the technical work packages and the pilots themselves. Specifically with the Stage-Gate-Process, it will be ensured that the EMERALD framework can provide support for the automation of audits and that the pilots provide the necessary data and inputs for the EMERALD component owners.
Files
EMERALD_D5.1_Pilot-definitionset-upvalidation-plan_v1.0.pdf
Files
(3.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:3d0f882c6e75f5e20317fa5ae72402ab
|
3.2 MB | Preview Download |
Additional details
Funding
Dates
- Submitted
-
2024-07
- Accepted
-
2025-07