Published December 31, 2024
| Version v1
Project deliverable
Open
D8.6 Public summary on the Exploitation Plan
Description
This document is the Public summary on the Exploitation Plan, presenting a synopsis of the MAELSTROM Exploitation Plan deliverable. The objective of the exploitation plan is to identify the main economic and noneconomic issues, relevant to prepare a realistic business plan for further uptake of MAELSTROM’s solutions for marine litter (ML) removal. To achieve such an objective, the present exploitation plan is based on a Validation-Identification-Preparation (V.I.P.) approach. To provide an analysis as effective as possible a mix of methodologies were utilised.
Files
D8.6.pdf
Files
(1.5 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:b70c5caa327daa41100046f86153b89e
|
1.5 MB | Preview Download |