D5.4 Final Report on operation of the surface and water column removal technology in the Porto region
Authors/Creators
-
1.
Centro Interdisciplinar de Investigação Marinha e Ambiental
- 2. Universidade do Porto Instituto de Ciências Biomédicas Abel Salazar
- 3. Interdisciplinary Centre of Marine and Environmental Research (CIIMAR)
- 4. University of OPorto
-
5.
Interdisciplinary Centre of Marine and Environmental Research
- 6. CIIMAR/Universidade do Porto
-
7.
Deltares
- 8. The Great Bubble Barrier
-
9.
University of Malta
Description
The present document corresponds to MAELSTROM’s Deliverable 5.4. This deliverable aims at summarising the implementation of the Bubble Barrier technology, including
the supplying solar panels, in Ave River estuary, Portugal (MAELSTROM Task 5.4), the efforts performed to understand its impact on the environment (in terms of energy
consumption, carbon footprint, noise and ecological impacts), and to present the technology effectiveness through the analysis of the riverine litter (RL) and microplastics (MP) retained by the technology during the pilot performing period. The document is structured around the phases of installation, implementation, optimization, assessment and impacts of the Bubble Barrier technology.
Files
D5.4.pdf
Files
(5.8 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:958171dd96564ae0c210d88b345cd711
|
5.8 MB | Preview Download |