Published February 12, 2025 | Version v1
Project deliverable Open

D5.4 Final Report on operation of the surface and water column removal technology in the Porto region

  • 1. ROR icon Centro Interdisciplinar de Investigação Marinha e Ambiental
  • 2. Universidade do Porto Instituto de Ciências Biomédicas Abel Salazar
  • 3. Interdisciplinary Centre of Marine and Environmental Research (CIIMAR)
  • 4. University of OPorto
  • 5. EDMO icon Interdisciplinary Centre of Marine and Environmental Research
  • 6. CIIMAR/Universidade do Porto
  • 7. EDMO icon Deltares
  • 8. The Great Bubble Barrier
  • 9. ROR icon University of Malta

Contributors

Project manager:

  • 1. EDMO icon Deltares
  • 2. ROR icon Institute of Marine Science

Description

The present document corresponds to MAELSTROM’s Deliverable 5.4. This deliverable aims at summarising the implementation of the Bubble Barrier technology, including
the supplying solar panels, in Ave River estuary, Portugal (MAELSTROM Task 5.4), the efforts performed to understand its impact on the environment (in terms of energy
consumption, carbon footprint, noise and ecological impacts), and to present the technology effectiveness through the analysis of the riverine litter (RL) and microplastics (MP) retained by the technology during the pilot performing period. The document is structured around the phases of installation, implementation, optimization, assessment and impacts of the Bubble Barrier technology.

Files

D5.4.pdf

Files (5.8 MB)

Name Size Download all
md5:958171dd96564ae0c210d88b345cd711
5.8 MB Preview Download

Additional details

Funding

European Commission
MAELSTROM - Smart technology for MArinE Litter SusTainable RemOval and Management 101000832