D6.3 AQUARIUS Dataflow Dashboard (ADD) Phase 1
Contributors
Project members:
- Warbout, Thomas1
-
Le, Hong Minh2
-
Iona, Athanasia (Sissy)3
-
Díez, Susana4
-
Partescano, Elena5
-
Sagen, Helge6
-
Buga, Luminita7
-
Schepers, Lennert8
- Hedblom, Mikael9
-
O'Grady, Eoin10
-
Van Iseghem, Sylvie11
- van der Horst, Serge1
- Weerheim, Paul1
-
GIORGETTI, Alessandra5
-
McMeel, Oonagh12
- Torrez, Pieter12
- Tonne, Nathalie12
- Armstrong, Frank10
-
1.
Marine Information Service
-
2.
Institute of Natural Sciences
-
3.
Hellenic Centre for Marine Research
-
4.
Instituto Español de Oceanografía
-
5.
National Institute of Oceanography and Applied Geophysics
-
6.
Norwegian Institute of Marine Research
- 7. National Institute for Marine Research and Development "Grigore Antipa"
-
8.
Flanders Marine Institute
-
9.
Swedish Meteorological and Hydrological Institute
-
10.
Marine Institute
- 11. IFREMER
-
12.
Seascape Belgium
Description
The AQUARIUS Deliverable 6.2 documents the AQUARIUS Data Management Plan (DMP) and describes the planned Data Management approach. The
approach covers multiple steps in the deployment of TA events, going from planning to reporting a summary of observations to gathering and standardising all
collected data sets in a FAIR way in the European leading data management infrastructures. This way, over time all information, metadata and data sets from the TA events will be published as open data and made widely accessible. This will be achieved by a close cooperation between the TA scientific teams and the expert
data centres that are active in AQUARIUS Work Package 6 for supporting data management and in WP5 for providing training about data management and prevailing European standards.
The results of the data management flow steps will be published on the AQUARIUS Dataflow Dashboard (ADD) which will be a dedicated section on the AQUARIUS website. This document, AQUARIUS Deliverable 6.3 documents the sitemap and planned development of the AQUARIUS Dataflow Dashboard (ADD). It also documents the metadata model and the development of the TA Summary Log APP. The APP and the ADD with initial components should be ready, well tested
and operational before M19 of the AQUARIUS project, when the expected (Transnational Access) TA events will be deployed as a follow-up of the 1st Call.
Files
D6.3 AQUARIUS Dataflow Dashboard (ADD) Phase 1 V1 Maris.pdf
Files
(1.5 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:30f3654fc4effdcb454947997c7a532d
|
1.5 MB | Preview Download |