D1.1. Inclusive Transformation Plan of Las Palmeras
Authors/Creators
Description
D1.1 Inclusive Transformation Plan of Las Palmeras describes the methodology, processes and initial results of the two-ways (top-down and bottom-up) co-design process to elaborate an Inclusive Transformation Plan to increase the Inclusive Health and Wellbeing of Las Palmeras neighbourhood, where most of the actions of the IN-HABIT project in Cordoba will be developed, as described in the WP1 of the Grant Agreement. The plan is a living document that establish the basis of the VIS to be implemented. These VIS will be adapted according to the evolution of the project.
Section 2 of the document details the stakeholder engagement and the community activation process carried out in Task 1.1 resulting in the establishment of Cordoba IN-HUB as a PPPP (public-private-people partnership) inclusive social laboratory. Sections 3 and 4, details the top- down and bottom-up co-design processes carried out by the partners UCO, AVUE, and CORDOBA (City Hall) together with the members of IN-HUB, the neighbours and other community representatives in Cordoba IN-HUB, as part of Task 1.2. Both processes have led to the co-design of the Visionary and Integrated Solutions (VIS) that will be part of this Plan.
Section 5 lists the so-called “hard” (based on infrastructure and physical solutions) and “soft” (based on social and cultural solutions) VIS that emerged as a result of the co-design process. A total of 44 VIS have been initially proposed organized in 5 areas of intervention: Health and Wellbeing; Culture, Heritage and Art; Gender, Diversity, Inclusion, and Social Innovation; Naturalization and Environment and Infrastructure, Technology, and Digitalization. As the project progresses the feasibility and acceptability of these VIS will be tested, and changes might be proposed. This section also includes a description of the first VIS that has been co-deployed (partially addressing Task 1.3), as well as plans for their co-deployment and co-management (partially addressing Task 1.4). The VIS description also includes KPIs for the monitoring and evaluation of the actions (partially addressing Task 1.5). The desired impact, objectives and expected changes, both from the general population and the minority targeted groups in Córdoba have been included.
Finally, Section 6 reflects on the challenges faced by the Cordoba partners in carrying out the aforementioned tasks and formulates some recommendations for the future replicability of its actions (partially addressing Task 1.6).
This ITP has been elaborated under a scenario of COVID-19 pandemic that has dramatically influenced the co-design, co-creation, co-implementation and co-management of the VIS, especially in a context as vulnerable as Las Palmeras, and has forced to unforeseen adaptations.
Files
D1.1 Inclusive Trans. Plan of Las Palmeras.pdf
Files
(5.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:a91d1fe72a155df515d4a57c8397a1f8
|
5.1 MB | Preview Download |
Additional details
Dates
- Submitted
-
2022-09-16
- Accepted
-
2024-04-21