Published January 31, 2025 | Version v1
Figure Open

Work Package 2 - Sampling sites

Authors/Creators

Description

Map with the location of the mine sites identified as potential contributors of sulphide minerals for the START activities.

Several hundred kg of discarded mining waste sulphides were collected only at sites where the necessary authorisations were granted.

Files

Map_samples_WP2.jpg

Files (694.8 kB)

Name Size Download all
md5:c1dbb63e6e335934d54c2cdbfd9d54e4
694.8 kB Preview Download

Additional details

Funding

European Commission
START - SUSTAINABLE ENERGY HARVESTING SYSTEMS BASED ON INNOVATIVE MINE WASTE RECYCLING 101058632