Published November 22, 2024 | Version v1
Project deliverable Open

D4.3_Base-cases definitions and KPI calculation for cement, steel, Bio-CHP and WtE plants with and without capture

Description

The first part of deliverable D4.3 provides a description of the reference facilities considered in the CaLby2030 project, the methodology and the definition of the various key performance indicators (KPIs) considered for energy, technical and economic comparisons. The integration of the various reference plants with a MEA solvent-based CO2 capture system is then described and analyzed. These plants are considered as benchmarks for comparing the performance of Calcium Looping (CaL) systems, which are analyzed in detail from an energy, technical and economic point of view for the different sectors in the last part of the deliverable.

Files

Calby2030_D4.3.pdf

Files (5.4 MB)

Name Size Download all
md5:771c99ba1df5c987379c7a4af5015fea
5.4 MB Preview Download

Additional details

Funding

European Commission
CaLby2030 – CALCIUM LOOPING TO CAPTURE CO2 FROM INDUSTRIAL PROCESSES BY 2030 101075416