Spatiotemporal evolution and renewable energy potential in coal regions in transition
Creators
Description
The WINTER project, funded by the EU, aims to develop a web GIS interactive platform that will be
used as a tool for the management of coal regions in transition. The platform will guide and
engage stakeholders by sharing best practices and addressing transition challenges in pilot
regions at different transition stages. The applied methodology involved a three-step process: 1)
developing a geodatabase to import and standardize geospatial datasets; 2) training and
implementing a Machine Learning (ML) approach [1]; and 3) identifying and quantifying land cover
(LC) changes from 2018 to 2021. Particularly in Western Macedonia (Greece), the Amynteo mine,
illustrated a green transition (Figure 1), converting mining areas to bare soil, vegetation and water
bodies, indicating strong reclamation potential. In contrast, the Ptolemaida mine, still operational,
illustrated minimal land cover changes. In Poland and specifically, in Konin region results
highlighted mining expansion, affecting agricultural and wetland areas. On the other hand, the
Kazimierz mine, which is already at a closure phase, exhibited a significant green transition, with a
marked increase in vegetation land cover.
The following step was the assessment for the potential for Renewable Energy Source (RES)
implementation utilizing, open-source geospatial datasets, considering factors like elevation/slope,
wind speed, solar radiation, and land cover/land use were used. Scenarios were designed to
identify preliminary suitable areas for Photovoltaic (PV) and Wind Parks (WP) installations. In
Western Macedonia, potential sites were identified adjacent to the Ptolemaida mine limits, with a
significant area suitable for PV parks. In Konin, the analysis within mine boundaries revealed
similar suitability for PV and WP, showing the highest potential for RES implementation.
Specifically, in Western Macedonia, the potentially suitable areas for PV was higher, up to 34% of
the total studied area, in contrast to the 12%-18% range observed in Konin's mines. Additionally,
the potentially suitable sites for WP in Western Macedonia seem to be related due to
geomorphological differences, whereas in Konin, the suitability analysis based on results within
the boundaries of the open-pit mine.
Files
EGU24-19829-print (1).pdf
Files
(1.6 MB)
Name | Size | Download all |
---|---|---|
md5:36cee844c77d9421bf095f25c0646cf7
|
295.7 kB | Preview Download |
md5:8ee8ae686de172b4b6aee80eb76e7693
|
1.3 MB | Preview Download |
Additional details
Identifiers
Funding
- WINTER 101057228
- European Commission