Analysing Factors Affecting Implementation of Automated Construction Progress Monitoring in Indian Construction Industry
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (A.P), India.
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (A.P), India.
- 2. Post Graduate Student, Department of Architecture, School of Planning and Architecture, Vijayawada (A.P), India.
Description
Abstract: Automated construction progress monitoring has evolved as a critical element in modern construction projects, increasing efficiency and decision-making processes. It has gained recognition as a revolutionary technology in the global construction industry. However, its successful implementation in India presents distinct problems driven by a variety of factors such as technological challenges, financial restrictions, a shortage of qualified labour, resistance to technology adoption, a high initial investment, and so on. This research explores the importance of automated construction progress monitoring, examines the factors that influence its adoption, and makes recommendations for its implementation in the Indian construction industry. By recognising these variables, construction stakeholders can better negotiate the hurdles and reap the benefits of automated monitoring technology.
Files
E984213050424.pdf
Files
(907.6 kB)
Name | Size | Download all |
---|---|---|
md5:0fd43a856f33862409a47fd8c7417d35
|
907.6 kB | Preview Download |
Additional details
Identifiers
- DOI
- 10.35940/ijitee.E9842.13050424
- EISSN
- 2278-3075
Dates
- Accepted
-
2024-04-15Manuscript received on 15 March 2024 | Revised Manuscript received on 20 March 2024 | Manuscript Accepted on 15 April 2024 | Manuscript published on 30 April 2024.
References
- Xue, J., Hou, X., & Zeng, Y. (2021c). Review of Image-Based 3D Reconstruction of building for Automated Construction Progress Monitoring. Applied Sciences, 11(17), 7840. https://doi.org/10.3390/app11177840
- Alizadehsalehi, S., & Yitmen, İ. (2018b). A concept for Automated construction progress monitoring: Technologies adoption for benchmarking project performance control. Arabian Journal for Science and Engineering, 44(5), 4993–5008. https://doi.org/10.1007/s13369-018-3669-1
- Reja, V. K., Pradeep, M. S., & Varghese, K. (2022). A Systematic Classification and Evaluation of Automated Progress Monitoring Technologies in Construction. Proceedings of the ISARC. https://doi.org/10.22260/isarc2022/0019
- Qureshi, A. H., Alaloul, W. S., Wing, W. K., Saad, S., Ammad, S., & Musarat, M. A. (2022). Factors impacting the implementation process of automated construction progress monitoring. Ain Shams Engineering Journal, 13(6), 101808. https://doi.org/10.1016/j.asej.2022.101808
- Brilakis, I. K., & Soibelman, L. (2008). Shape-based retrieval of construction site photographs. Journal of Computing in Civil Engineering, 22(1), 14-20.
- Kopsida M, Brilakis I, Vela P. A review of automated construction progress and inspection methods. In: Proc. 32nd CIB W78 Conf. Constr. IT; 2015: pp. 421– 431.
- Pazhoohesh M, Zhang C. Automated construction progress monitoring using thermal images and Wireless Sensor Networks. In: Proceedings, Annu. Conf. - Can. Soc. Civ. Eng., 2015: pp. 593–602.
- Son H, Kim C. 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring. Autom Constr 2010;19(7):844–54. doi: https://doi.org/10.1016/j.autcon.2010.03.003.
- Alaloul WS, Qureshi AH, Musarat MA, Saad S. Evolution of closerange detection and data acquisition technologies towards automation in construction progress monitoring. J Build Eng 2021; 43:102877. doi: https:// doi.org/10.1016/j.jobe.2021.102877.
- El-Omari S, Moselhi O. Integrating automated data acquisition technologies for progress reporting of construction projects. Autom Constr 2011;20 (6):699–705. doi: https://doi.org/10.1016/j.autcon.2010.12.001
- Qureshi, A. H., Alaloul, W. S., Wing, W. K., Saad, S., Musarat, M. A., Ammad, S., & Kineber, A. F. (2023). Automated progress monitoring technological model for construction projects. Ain Shams Engineering Journal, 14(10), 102165. https://doi.org/10.1016/j.asej.2023.102165
- Systematic Literature Research of the Current Implementation of Unmanned Aerial System (UAS) in the Construction Industry. (2019). In International Journal of Innovative Technology and Exploring Engineering (Vol. 8, Issue 11S, pp. 416–428). https://doi.org/10.35940/ijitee.k1073.09811s19
- Mahajan, G. (2021). Applications of Drone Technology in Construction Industry: A Study 2012-2021. In International Journal of Engineering and Advanced Technology (Vol. 11, Issue 1, pp. 224– 239). https://doi.org/10.35940/ijeat.a3165.1011121
- Anjaneyulu, B., & Sankar, Dr. A. B. (2020). Intensive Modulated Three-Dimensional Computed Tomography Radio Therapy. In International Journal of Recent Technology and Engineering (IJRTE) (Vol. 8, Issue 5, pp. 2437–2440). https://doi.org/10.35940/ijrte.e5075.018520
- Nasir, F. M., & Watabe, H. (2020). Validation of the Image Registration Technique from Functional Near Infrared Spectroscopy (fNIRS) Signal and Positron Emission Tomography (PET) Image. In International Journal of Management and Humanities (Vol. 4, Issue 9, pp. 63–69). https://doi.org/10.35940/ijmh.i0877.054920
- Kumari, J., Patidar, K., Saxena, Mr. G., & Kushwaha, Mr. R. (2021). A Hybrid Enhanced Real-Time Face Recognition Model using Machine Learning Method with Dimension Reduction. In Indian Journal of Artificial Intelligence and Neural Networking (Vol. 1, Issue 3, pp. 12–16). https://doi.org/10.54105/ijainn.b1027.061321