Deliverable D5.10 is the result of the work carried out in T5.5 during the period of M9 to M26 of the project. The main purpose of this report is to describe the preliminary replication strategy specification to allow and motivate RESTORE’s stakeholders to create additional cases and trials during the project lifetime, within the RESTORE virtual tool powered by the IPSE GO simulation web-platform. The creation of stakeholders’ additional test-cases will be based on the RESTORE 6 virtual use-cases [1] and worked-out in WP5 task T5.4 (Implementation, Optimization, Management & Validation of RESTORE Use-Cases using the Simulation Web Platform).
The information provided in this document builds upon collaboration between SIMTECH and PROSPEX Institute (PI), with contributions from other RESTORE partners, in the sense that it considers inputs from published results from WP1, WP6, and WP7, namely: the general guideline of Deliverable D1.1 of the RESTORE overall concept [2]; the Deliverable D1.4 on the specifications of RESTORE Use-Cases and Models [3]; the technology watch and market evaluation report, Deliverable D6.6 [4]; the Deliverable D6.9 - Report on Exploitation & Stakeholders Group Management (V1) [5]; and Deliverable D7.9 on community building activities [6].
Files
D5-10 RESTORE Replication Strategy (V1) - Version V1.0.pdf
Files
(3.3 MB)
Name | Size | Download all |
---|---|---|
md5:64a4c58a6671436ac466f5b36fcc0230
|
3.3 MB | Preview Download |
Additional details
Related works
- Requires
- Project deliverable: 10.5281/zenodo.8074929 (DOI)
- Project deliverable: 10.5281/zenodo.10391289 (DOI)
Funding
References
- European Commission, Horizon 2020 Project RESTORE "Renewable Energy based seasonal Storage Technology in Order to Raise Environmental sustainability of DHC", https://cordis.europa.eu/project/id/101036766,Grant Agreement GA Nr.101036766, August 207th, 2021.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. Deliverable D1.1 - Report on Requirements and Specifications of the Overall Concept (V1), ed.: Francisco Cabello (CENER), March 31st, 2023.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. Deliverable D1.4 - Specifications of RESTORE Use-Cases and Models, ed.: F. Dargam (SIMTECH), E. Perz (SIMTECH), September 30th, 2023.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. Deliverable D6.6 - Report on technology watch and market evaluation V2, ed.: A. Werner (TU-WIEN), L. Hörner (SIG S2i), M. Astolfi (POLIMI); H. Bürgmayr (TU-WIEN); S. J. Hasannejad (TU-WIEN), September 30th, 2023.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. Deliverable D6.9 - Report on Exploitation & Stakeholders Group Management (V1), ed.: Francisco Cabello (CENER), September 30th, 2023.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. Deliverable D7.9 - Report on community building activities (V1), ed.: K. Faradsch (PI), A. Hahn (PI), L. Loubaton (PI), September 30th, 2023.
- SIMTECH GmbH, "The Process Simulation Environment IPSEpro", https://www.simtechnology.com/cms/ipsepro/process-simulation-and-heat-balance-software, © 2023 SimTech GmbH.
- SIMTECH GmbH, "IPSE GO: The Future of Simulation", https://about.ipsego.app/, © 2023 SimTech GmbH.
- SIMTECH GmbH, "IPSEpro & IPSE GO - Powerful Process and Heat Balance Simulation Solutions", https://www.linkedin.com/pulse/ipsepro-ipse-go-powerful-process-heat-balance-simulation/, © 2023 SimTech GmbH.
- European Commission, RESTORE Horizon 2020 Project GA Nr.101036766. RESTORE 1st Interim Report, ed.: Francisco Cabello (CENER) & All Partners, M18, March 30th, 2023.