There is a newer version of the record available.

Published December 12, 2023 | Version v1
Dataset Open

Parameters used in the case study of the paper entitled "Bridging the gap between regulatory and operational aspects in the context of increasing distributed generation uptake: a stochastic bi-level optimization approach""

  • 1. ROR icon Universidade Federal de Itajubá

Files

Files (11.4 kB)

Name Size Download all
md5:589f8e389a0f19e298d337b827fe1bfd
11.4 kB Download