Info: Zenodo’s user support line is staffed on regular business days between Dec 23 and Jan 5. Response times may be slightly longer than normal.

Published December 9, 2022 | Version v1
Conference paper Open

10.1109/IECON49645.2022.9968382

  • 1. TotalEnergies

Description

This paper explores the design of a single control system for a battery energy storage system (BESS) that can be used with various Distributed Energy Resources (DER) assets. The main challenge is to ensure smooth operation and transition between grid-connected and standalone modes while efficiently distributing power between the load, battery, and grid. A unified controller scheme is proposed and evaluated through simulations of different case studies. The results show that the proposed control scheme responds well to grid power events and load variations.

Files

2022147093.pdf

Files (1.3 MB)

Name Size Download all
md5:dfb5457a17e88c551b85b4524020c1b1
1.3 MB Preview Download