Project milestone Open Access

Collection of feedback from industrial partners and RIs participating in I.FAST

I.FAST WP3 members

The fundamental goal of the Task 3 of WP3 of IFAST (WP3.3) is to identify how the accelerator science and technology community can improve the effectiveness of industry-research institution collaboration since early stages. In this milestone report, the workplan of WP3.3 is described, together with a description of the activities done at this period of the project. In particular, the collection of feedback from industrial partners and RIs.

Files (1.6 MB)
Name Size
IFAST_MS10_Final.pdf
md5:ddb41c18b2780f06e68a238bbb516563
1.6 MB Download
  • I.FAST MS10

12
14
views
downloads
All versions This version
Views 1212
Downloads 1414
Data volume 22.7 MB22.7 MB
Unique views 1010
Unique downloads 1212

Share

Cite as