Published March 1, 2023 | Version v1
Journal article Open

Automated drainage system for thermoelectric power plant

  • 1. Faculty of Engineering and Management, Universidad Nacional Tecnológica de Lima Sur, Lima, Perú
  • 2. School of Economics, Universidad Nacional Federico Villarreal, Lima, Perú
  • 3. Faculty of Chemical Engineering, Universidad Nacional del Callao, Lima, Perú
  • 4. Faculty of Industrial and Systems Engineering, Universidad Nacional del Callao, Lima, Perú
  • 5. Faculty of Health Sciences, Universidad Autónoma de Ica, Ica, Perú

Description

The Chilca 2 thermoelectric power plant, located in the province of Lima, Peru, has an open cycle gas turbine and a combined cycle steam turbine, whose combined capacity is 112.8 MW (Mega Watts). This plant requires auxiliary equipment for its operation, which is why it consists of electrical systems, lubrication system, hydraulic ventilation, pumps, vacuum systems and drainage of condensate generated by the difference in temperature in the steam conductor. Said drainage system is inside a 5-meter-deep basement that, being exposed to the elements, is exposed to falling drops of water that are generated by the vapors that are released due to the difference in temperature, repeatedly flooding and exposing to hazards that affect the normal operation of the thermoelectric plant. The proposed solution is based on the philosophy of a feedback control system, which uses a programmable logic controller (PLC) Siemens 1214AC/DC/Relay programmable logic controller, which, through a frequency inverter, activates the drainage pumps; the frequency range at which the variator works is linked to a 4-position level sensor. The result shows that it was possible to activate the frequency variator in a controlled manner through frequencies of 10 Hz, 30 Hz and 60 Hz, in this way a sustained operation of the drainage system is guaranteed.

Files

29282-60402-1-PB.pdf

Files (409.7 kB)

Name Size Download all
md5:e16335dbd64b7953547e0b742995e814
409.7 kB Preview Download