Investigation on factors causing construction delay and their effects on the development of Oman's construction industry

  • 1. University of Technology and Applied Sciences

Description

Construction delay in projects is a common manifestation in the construction industry. Delay in construction will lead to a bad relationship between the parties involved and will also lead to an increase in the allocated completion time. Delay in the ongoing project might result in the loss of the money, time and other facilities by the client and cause a lot of financial damage to the contractor due to its investment in the purchase of equipment, construction materials and the hire of skilled workers. Delay in construction is a common problem that occurs mostly due to the unforeseen problems during the design & construction stages which often lead to delays in the completion of the project. Oman's construction industry is one of the most important industries for the country's economic development and growth. In this study, analysis of some available literature was conducted, and a questionnaire survey was floated among contractors, consultants, clients, project managers, and engineers involved in construction projects. All the collected responses were evaluated by using SPSS. The results of the study identified a total of 60 causes of delay out of which three factors have a "High" significance level for construction delays. These factors of "High" significance were associated with "Client related issues only" in which the initial design was altered by the client, delaying in deciding by the client and, scope change by the client. Majority of the delay (84 %) was observed to be lying in the range of 1‑2 years. This study also recognized the effect and minimization of regular delay and delay resulted due to Covid-19. Minimizing construction delay criteria can be managed by having a proper control system in the project time and funds

Files

1865-Article Text-7228-1-10-20221129.pdf

Files (1.1 MB)

Name Size Download all
md5:a495353462af40ba9883131f972ed301
1.1 MB Preview Download

Additional details

References

  • Sha, M. K., Shahi, P. B., Pandit, R., Pandey, A. (2017). Causes and Effects of Delays in Constrution Projets. IOSR Journal of Mechanical and Civil Engineering, 14 (02), 52–58. doi: https://doi.org/10.9790/1684-1402065258
  • Aydin, D., Mihlayanlar, E. (2018). Causes and Effects of Construction Project Delays. A Local Case Study in Edirne City Centre. 5th International Project and Construction Management Conference (IPCMC 2018). Available at: https://www.researchgate.net/publication/329415192_Causes_and_Effects_of_Construction_Project_Delays_A_Local_Case_Study_in_Edirne_City_Centre
  • Oman Observer. Newspaper dated 12/03/2019.
  • Durdyev, S., Hosseini, M. R. (2019). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 13 (1), 20–46. doi: https://doi.org/10.1108/ijmpb-09-2018-0178
  • Assaf, S. A., Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24 (4), 349–357. doi: https://doi.org/10.1016/j.ijproman.2005.11.010
  • Hoda, A., Ossama, H., Khaleed, N., Ranis, E. (2018). Delay Analysis Techniques in Construction Projects Building Tomorrow's Society Fredericton. Canada.
  • Khattri, T., Agarwal, S., Gupta, V., Pandey, M. (2016). Causes and Effects of Delay in Construction Project. International Research Journal of Engineering and Technology (IRJET), 03 (10).
  • Emam, H., Farrell, P., Abdelaal, M. (2014). Causes of Delay in GCC Construction Projects: A Critical Review. Conference: 1st International Conference on Smar, Sustainable and Healthy Cities [CIB-MENA]. Abu Dhabi, 607–621. doi: https://doi.org/10.13140/2.1.1211.8086
  • Hisham, S. N. A., Yahya, K. (2016). Causes and Effects of Delays in Construction Industry. Vol. 2 Construction Management Transportation.
  • Benarroche, A. (2019). Which Type of Construction Delay: Excusable, Compensable, or Critical? Levelset. Available at: https://www.levelset.com/blog/construction-delay-claim-defenses/
  • Ministry Gets New Building after Costly 11-Year Delay (2015). Gulf News. Available at: https://gulfnews.com/world/gulf/oman/ministry-gets-new-building-after-costly-11-year-delay-1.1632619
  • Hammadi, S. A., Nawab, M. S. (2016). Study of Delay Factors in Construction Projects. IARJSET, 3 (4), 87–93. doi: https://doi.org/10.17148/iarjset.2016.3420
  • Motelab, O., Kishk, M. (2010). An investigation into causes and effects of construction delays in UAE. Procs 26th Annual ARCOM Conference, 6-8 September 2010. Leeds, UK, Association of Researchers in Construction Management, 1149–1157.
  • Gebrehiwet, T., Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Engineering, 196, 366–374. doi: https://doi.org/10.1016/j.proeng.2017.07.212
  • Abu Hassan, M. N. (2016). Causes of delay in construction projects. Qatar University.
  • Chan, D. W., Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15 (1), 55–63. doi: https://doi.org/10.1016/s0263-7863(96)00039-7
  • Al-Nuaimi, A., Mohsin, M. (2013). Causes of Delay in Completion of Construction Projects in Oman. International Conference on Innovations in Engineering and Technology (ICIET'2013). Bangkok.
  • Imran Latif, Q. B. alias, Al Saadi, A. M. D., Abdul Rahman, I. (2019). Identification of Delay Factor in Oman Construction Industry. International Journal of Sustainable Construction Engineering Technology, 10 (1). doi: https://doi.org/10.30880/ijscet.2019.10.01.004
  • Singh, S., Bala, A., Dixit, S., Varshney, D. (2018). Critical Analysis of Causes of Delay in Residential Construction Projects in India. International Journal of Civil Engineering and Technology (IJCIET), 9 (1), 330–345.
  • Amri, T. A., Marey-Pérez, M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 87–102. doi: https://doi.org/10.5267/j.jpm.2020.1.001
  • Al-Emad, N., Nagapan, S. (2015). Identification of Delay Factors from Mecca's Construction Experts Perspective. International Journal of Sustainable Construction Engineering & Technology, 6 (2).
  • Alotaibi, N. O., Sutrisna, M., Chong, H.-Y. (2016). Guidelines of Using Project Management Tools and Techniques to Mitigate Factors Causing Delays in Public Construction Projects in Kingdom of Saudi Arabia. Journal of Engineering, Project, and Production Management, 6 (2), 90–103. doi: https://doi.org/10.32738/jeppm.201607.0003
  • Aziz, R. F., Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55 (2), 1515–1539. doi: https://doi.org/10.1016/j.aej.2016.03.006
  • Khair, K., Farouk, H., Mohamed, Z., Mohammad, R. (2016). Causes and Effects of Delay Factors in Road Construction Projects in Sudan. International Journal of Applied Engineering Research, 11 (18), 9526–9533.
  • Al-Amri, T., Perez, M. M. (2020). Impact of Covid-19 on Oman's Construction Industry. Technium Social Sciences Journal, 9, 661–670. doi: https://doi.org/10.47577/tssj.v9i1.1021
  • Khoiry, M. A., Kalaisilven, S., Abdullah, A. (2018). A Review of Minimizing Delay in Construction Industries. E3S Web of Conferences, 65, 03004. doi: https://doi.org/10.1051/e3sconf/20186503004
  • Kamandang, Z. R., Casita, C. B. (2018). Delays in Construction Project: A Review. The 1st International Conference on Advanced Engineering and Technology – 2018. doi: https://doi.org/10.12962/j23546026.y2018i6.4631
  • Doloi, H., Sawhney, A., Iyer, K. C., Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30 (4), 479–489. doi: https://doi.org/10.1016/j.ijproman.2011.10.004
  • Durdyev, S., Omarov, M., Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4 (1), 1291117. doi: https://doi.org/10.1080/23311916.2017.1291117
  • Polat, G., Damci, A., Turkoglu, H., Gurgun, A. P. (2017). Identification of Root Causes of Construction and Demolition (C&D) Waste: The Case of Turkey. Procedia Engineering, 196, 948–955. doi: https://doi.org/10.1016/j.proeng.2017.08.035
  • Durdyev, S., Omarov, M., Ismail, S. (2016). SWOT Analysis of the Cambodian construction industry within the ASEAN economic community. Proceedings of the 28th International Business Information Management Association Conference. Seville.