Published May 27, 2022
| Version v1
Project deliverable
Open
D 1.2 Initial report on user needs
Contributors
- 1. CYI
- 2. TECNALIA
- 3. INCEPTION
Description
This report describes the results of Tasks T1.2 and T1.4 concerning the mapping risk and user needs.
Files
D1.2.pdf
Files
(13.1 MB)
Name | Size | Download all |
---|---|---|
md5:9e684bbc65762ae87b54d6e0a237976c
|
13.1 MB | Preview Download |