Deliverable D4.3 Demonstration Execution Plan, F-REL

  • 1. AETHON Engineering
  • 1. OLTIS
  • 2. Politecnico di Milano
  • 3. CEFRIEL
  • 4. AITEC

Description

This document constitutes the Deliverable D4.3 "Demonstration Execution Plan, F-REL" of the IP4MaaS Project. It delivers a detailed plan for preparing and executing the F-REL phase of the demonstrations. The demonstration execution and technology integration plan has been updated to reflect changes in requirements for demonstration (e.g., new releases, new integration activities) or amend issues with demonstrations. D4.3 provides the following: • An updated meaningful roadmap based on the work conducted in WP2, WP3, and WP4 of the project, and specifically deliverables D2.1, D2.2, D2.3, D3.2, a revised version of D4.1, and a revised version of the D4.2. The roadmap for the F-REL demonstrations was also produced with the contribution of the Management, Data, and Integration Committees that have initiated their work and facilitated the exchange of information. • An overview of the technologies of the IP4 Ecosystem that are available for the demonstrations, as well as those under development for utilization in the 2nd Phase. • An overview of the demo sites and the partaking TSPs, the demo leaders of each demo site, and the technologies of the IP4 Ecosystem that are available will be demonstrated during the 2nd phase of the demonstrations from each TSP. • The respective travel solutions and use cases for each demo site. • An overview of the operational KPIs for the respective functionalities that will be demonstrated during F-REL, as they have been identified, as well as an overview of the methodology to be used to measure them. In addition, an overview is provided regarding the Effectiveness Rate Calculation, which will be calculated with the utilization of the KPIs and the User Satisfaction Index (USI) surveys. A hierarchy of priorities across the technologies' operational, semantic, and technical levels is to be demonstrated. • A roadmap with expected outcomes (technical solutions/components) and their connection with the complementary projects. • A clear structure for the preparation and execution of the F-REL demonstrations will be performed in 6 separate phases. • A detailed description of the essential components of the F-REL demonstrations: time plan, role assignment, risks & mitigation measures. • A description of the roles and responsibilities of each stakeholder. • A description of the activities being performed by the Integration Committee, the Data Committee, and the Management Committee. This document will be the guide for executing the F-REL demonstrations in WP5.

Files

IP4MaaS_D4.3_Demonstration Execution Plan F-REL.pdf

Files (2.1 MB)

Additional details

Funding

IP4MaaS – Shift2Rail IP4 to support the deployment of Mobility as a Service 101015492
European Commission