Published October 17, 2022 | Version v1

Muon collider based on gamma factory, FCC-ee and plasma target

  • 1. CERN, Geneva, Switzerland
  • 2. Geneva University, Geneva, Switzerland
  • 3. INFN-LNF, Frascati, Italy

Description

The LEMMA-type muon collider generates muon pairs by the annihilation of 45 GeV positrons with electrons at rest. Due to the small cross section, an extremely high rate of positrons is required, which could be achieved by a “Gamma factory” based on the LHC. Other challenges with the LEMMA-type muon production scheme include the emit-tance preservation of muons and muon-generating positrons upon multiple traversals through a target, and the merging of many separate muon bunchlets. These two challenges may potentially be overcome by (1) operating the FCC-ee booster with a barrier bucket and induction acceleration, so that all positrons of a production cycle are merged into one single superbunch, instead of storing ∼10,000 separate bunches; and (2) sending the positron superbunch into a plasma target. During the passage of the positron superbunch, the electron density is enhanced more than 1000-fold without any in-crease in the density of nuclei, so that beamstrahlung and Coulomb scattering are essentially absent. We investigate prospects and difficulties of this approach, including emit-tance growth due to filamentation in the nonlinear plasma channel and due to positron self-modulation.

Files

P1_Zimmermann_MuonCollider.pdf

Files (1.0 MB)

Name Size
md5:bf27053450a5db8bcff9d3c34f33cae6
1.0 MB Preview Download

Additional details

Funding

European Commission
I.FAST - Innovation Fostering in Accelerator Science and Technology 101004730