UPDATE: Zenodo migration postponed to Oct 13 from 06:00-08:00 UTC. Read the announcement.

Report Open Access

D3.7 PIACERE IDE-v1_v1.0

Marc Gil, Alfonso de la Fuente, Ismael Torres

This deliverable is the output of Task 3.5 and it will also be iterative. The deliverable will be composed of a software prototype and a technical design document. This outcome will present the IDE resulting from the integration of KR1,
KR3 - KR8. The software will be accompanied by a Technical Specification Report
 

Files (5.0 MB)
Name Size
D3.7 PIACERE IDE-v1_v1.0_marca.pdf
md5:c43be3807c07f32f53b2c7a2106836c8
5.0 MB Download
37
40
views
downloads
All versions This version
Views 3737
Downloads 4040
Data volume 201.5 MB201.5 MB
Unique views 3131
Unique downloads 3737

Share

Cite as