Published September 25, 2021 | Version v1
Journal article Open

Slow and Fast Charging Solutions for Li-Ion Batteries of Electric Heavy-Duty Vehicles with Fleet Management Strategies

  • 1. MOBI Research Group, Vrije Universiteit Brussel, Pleinlaan 2, 1050 Brussels, Belgium
  • 2. Solaris Bus & Coach sp. z o.o., Obornicka 46, Bolechowo Osie-dle, 62-005 Owińska, Poland
  • 3. Przedsiebiorstwo Komunikacji Miejskiej Spolka Z Ograniczona Odpowiedzialnoscia, 9 Krakowska Street, 43-600 Jaworzno, Poland

Description

This work presents a real-life demonstration of 23 heavy-duty (HD) public electric buses (e-buses) in Jaworzno, Poland, with three lengths: 8.9 m, 12 m, and 18 m. The e-bus demo is based on the development of baseline e-buses to optimize the operational cost based on technical optimization. The demo aims to switch public transportation from internal combustion engine vehicles (ICEVs) to electric ones to minimize CO2 emissions. The e-buses are equipped with standard charging solutions, which are plug-in charging with Combined Charging System Type 2 (CCS2, Combo 2) and pantograph-up (Type B). The CCS2 solution is used for overnight slow/normal charging (NC) in the depot of the e-bus operator, whereas the pantograph charging solutions are installed along the e-buses routes and used for fast charging (FC) when the e-buses are stopped for a short time. In Jaworzno, there are 20 chargers with CCS2 in the depot of the e-bus operator and 12 pantograph-up (Type B solution) fast-charging stations. This work studies the technical operations and operational costs of the e-bus fleet, and the impact of the NC and FC solutions on the Li-ion battery packs and on the grid. The uncoordinated/standard and coordinated charging (smart charging) based on load shifting were investigated to study the impact of e-bus fleet integration on the distribution grid. The exploited data in this study were collected from the data logger devices, which are installed on the e-buses and record over 46 signals. Data from over one year were collected, and some sample data were processed and analyzed to study the technical and economic operations of the e-bus fleet.

Files

sustainability-13-10639-v2.pdf

Files (16.8 MB)

Name Size Download all
md5:acde722bb333b01f1d90ef2c5d092019
16.8 MB Preview Download

Additional details

Funding

ASSURED – fASt and Smart charging solutions for full size URban hEavy Duty applications 769850
European Commission