D2.2 Demonstration requirements and scenarios C-REL
Description
This document provides: • A detailed description of the methodology adopted by the IP4MaaS project for the definition of demonstration requirements and scenarios. The methodology, based on the principles of the participatory design, supports: (i) the identification of aim and objectives of each demonstration, highlighting the needs and expectations expressed by the stakeholders involved; (ii) the definition of maps representing clear pictures of current multimodal travel experiences in the demonstration site, highlighting problems and areas for potential improvement; (iii) the definition of another set of maps representing new travel experiences enabled by the integration of IP4 technologies and TSP services, and (iv) the identification of demonstration requirements and scenarios supporting the planning and execution of the IP4MaaS demonstrations.• The results of the application of the methodology to Barcelona, Athens, and Padua that are the demonstration sites involved in IP4MaaS C-REL demonstrations. • A preliminary analysis of the other three demonstration sites (i.e., Liberec, Osijek, and Warsaw) that will contribute to the definition of demonstration scenarios for the IP4MaaS F-REL demonstrations. • The list of Shift2Rail IP4 functionalities that are candidates to be tested by IP4MaaS for C-REL demonstrations for each involved demonstration site.
Files
IP4M_D2.2_Demonstration requirements and scenarios C-REL.pdf
Files
(4.7 MB)
Name | Size | Download all |
---|---|---|
md5:e44fd083006b99d94da04d1da5430a5d
|
4.7 MB | Preview Download |